  1. UD.SALI PASIR PASANG 125.000/M3 ....

    ReplyDelete
  2. BETON READYMIK K-250 171,24 M3 x 860.000,00 = 147.266.400,00


    TERKIRIM SAAT INI 119,00 M3 x 810.000,00 = 96.390.000,00
    RENCANA SAMPAI 100 % COR LANTAI 40,00 M3 x 810.000,00 = 32.400.000,00
    PLASTIK COR 11,00 Roll x 65.000,00 = 715.000,00
    Total Terambil 129.505.000,00

    Selisih 147.266.400,00 - 129.505.000,00 = 17.761.400,00

    PENGALIHAN BIAYA PEMBELIAN PASIR PASANG 40 M3
    Pasir Pasang Tambahan 10 M3*4 UNIT= 40 M3x 125.000,00 = 5.000.000,00
    Sisa Biaya ( Beton K-250 ) 17.761.400 - 5.000.000 = 12.761.400,00

    Mohon Di Proses Untuk Pekerjaan Plester Bengkel Instrument ..Terima Kasih

    ReplyDelete
  3. pasir pasang
    - code 77 m3
    - terkirim 55,48 m3
    - permintaan 40 m3 x 125.000
    total 95,48 m3
    over

    DIkirim 22 m3 saja

    NO PO : 0097-DKN-IGG.BENGKEL/05.19
    *************************************