Sunday, April 7, 2019

IB10225 UPAH BAJA TOTAL Bengkel Instrument










6 comments:

  1. PERMINTAAN ALAMAT INI , IKUT BORONGAN SIAPA YA
    Mohon di betulkan dulu
    1. https://iggbengkel.blogspot.com/2019/04/ib10231-upah-baja-wf-450-untuk-rell.html

    2. https://iggbengkel.blogspot.com/2019/04/ib10225-upah-pasang-atap-bengkel.html

    3. https://iggbengkel.blogspot.com/2019/04/upah-baja-total-bengkel-instrument.html


    DITUNGGU

    ReplyDelete
  2. Ataka
    Progres 115.000.000
    Terbayar 23.000.000
    Material 30.000.000
    Retensi 5.750.000
    Sisa 56.250.000

    ReplyDelete
  3. Belum dipotong material tahap 2.
    Total material 95.800.000
    Terpotong tahap 1 => 30.000.000
    Sisa material 65.800.000

    ReplyDelete
  4. Ataka
    Progres 115.000.000
    Terbayar 23.000.000
    Material 30.000.000
    Retensi 5.750.000
    Sisa 56.250.000

    Belum dipotong material tahap 2.
    Total material 95.800.000
    Terpotong tahap 1 => 30.000.000
    Sisa material 65.800.000

    ReplyDelete
  5. ATAKA
    - Opnam : 115.000.000,-
    - Terbayar : 23.000.000,-
    - material : 60.000.000,-
    - retensi : 6.000.000,-
    - Sisa : 26.000.000,-

    - Rencana : 20.000.000,-

    PEMBAYARAN : EKO ATAKA
    - Rek. EKO ATAKA : Diinput mas priadi
    - Dibayarkan : 20.000.000,-
    - Jatuh Tempo : Data Disiapkan Mas priadi

    ReplyDelete
  6. Data pembayaran sudah disiapkan.

    ReplyDelete